List Work Orders Resources With Task By Items
Consult resources used in an OT, with the information of the OT to which they are linked, grouping and flattening the data.
General information:
| Module | Category |
|---|---|
Resources |
query |
Molecule details
Input parameters:
No input parameters
Output parameters:
No output parameters
Input schema:
| Field | Type | Required | Description | Default value | Examples |
|---|---|---|---|---|---|
Usage example:
{
"wo_folio": "WO123",
"since": "2024-01-01",
"until": "2024-12-31"
}
Notes:
Use this model to query resources used in an OT and flatten the data.